Arch Tunnel Team
Disassembly and storage of all sidewalk arch tunnels.
Rounded Arch Tunnels
Locations
- Coffee shop entrance
- Sidewalk between Building A and Building C
- Remove lights
- Lights should come off in 1-meter sections
- Cut zip ties one section at a time
- Disconnect plastic pieces per section
- Roll each section tightly
- Wrap each section in shrink wrap so they cannot get tangled
- Bring wrapped sections to Building A back storage
- Disassemle frame
- Disconnect all straight horizontal poles
- Sort horizontal poles per arch by length and bundle them together with tape so they do not get mixed up with other poles in storage
- Split hoops into thirds, do not completely disassemble, this makes it easier for you and the assembly team next Christmas
- Stage frames outside the Coffee Co Gate for the truck team to take to the trailer by the street
Train Tunnel
- Sidewalk to the east of the Jurrasic Park Building C doors
- Clip and zipties that are attaching the lights to the legs (keep all lights attched to the top until you lower it)
- Take out all legs and lower the top
- Clip and zipties that are attaching the lights to the top
- Fold the lights as one large mesh in half, then in half the same direction then roll all lights together into one large roll.
- Shrink wrap the roll of lights so they cannot get tangled
- Bring wrapped lights to Building A back storage
- Tape all frame pieces together into a large bundle(s) so they do not get mixed up with other poles in storage
- Stage frames at the end of that west side walk near the parking lot for the truck team to take to the trailer by the street
Final Checklist
- All light sections wrapped
- Lights brought to Building A storage area
- Metal frames broght to trailer by the street with the help of the a truck or Bertha with a trailer
- See if anyone else needs help
Notes
- Tim should be available on radio channel 13
- When finished check in with Tim